Tightly Linked PM

TIghtly Linked PMs enable agencies to replace a Scheduled PM with an alternative PM based on a tightly linked schedule. Tightly Linked Schedules are not based on time or meter readings (like a Scheduled PM), but instead are based on how often the initial PM is generated. When a Tightly Linked PM is due, it replaces the original PM and the resulting Work Order will reflect the configuration of the Tightly Linked PM instead of the original Scheduled PM.

tightly linked pm

Below is a diagram of two PMs that are linked together. PM A is a Scheduled PM. PM B is a Tightly Linked PM. PM B replaces PM A at an interval.

betweenpm