Summary/Custom Tab

The second tab of the TV Observations record appears below. This tab contains additional fields used to rate the observation and defects found. For a description of these fields, refer to the table below:

Field Name

Description

Estimated GPM

The estimated flow rate is a default value assigned from the Inspection Setup table.

Structure #

The program automatically assigns the structure number from the Inspection Setup table.

Cleaning #

The program automatically assigns the cleaning number from the Inspection Setup table.

% I/I Removed

Use this field to record the percent of infiltration and inflow that was removed due to the rehabilitation.

Remaining GPM

This field allows you to record the amount of flow remaining after rehabilitation.

Repaired

This field allows you to indicate the type of rehabilitation performed.

Min Rehab Priority

This field is used to indicate the rehabilitation priority. The Sewer Rehab model will refer to this priority value when determining whether to select a defect for rehabilitation or replacement.

Rehab Method

This field is used to indicate which rehab method should be used if this defect is selected for rehabilitation or replacement in the Sewer Rehab model runs.

Rehab Cost

This field is used to indicate the rehab cost for the observed defect. If a value is included in this field, it will be used in the Sewer Rehab model runs. If no value is included, the model runs will use their own default calculations.

User

These user-defined fields allow you to include additional, custom information.

See Also

TV Observation Tab

Adding an Observation

Viewing, Editing, and Deleting Records

Creating a Work Order