Installing a Pump
- Right click on the slot where the pump is installed and select Install Pump. The following window will appear:
- Enter the Date. This is required.
- Enter the Pump Number of the pump to install. This is required. Click the field caption or click in the field and press F9 or for a list of available pumps.
Note: Only pumps in the Sewer Pump Inventory module that are not already associated with a pump station will be available.
- Enter the meter reading at the time of the install.
Note: The Action field is automatically populated.
- Enter any additional comments in the grid.
- Save and close the window
Note: When a Pump is installed the Slot Number and Location will be carried over to the corresponding fields in the Pump Inventory record.
|