Costs per Pipe Diameter

This grid in the Rehab Work Tasks and Costs module allows you to set up rehabilitation costs per pipe diameter. You can create as many Cost per Diameter records as needed. If a pipe meets the diameter criteria established below, these costs will be used instead of the initial Default Task Cost defined in the parent Rehab Work Tasks and Costs record.

  1. Right click in the grid and select Add Record. The following window will appear:

    Diameter Costs

  2. Enter the pipe diameter in inches in the field provided. This is required in order to save the record.
  3. Record the cost per foot to perform the rehab task in this record on each of the following pipe classifications (for pipes up to 10 feet deep):
  4. For pipes at a depth greater than 10 feet, use the field provided to record the cost per vertical foot to perform the rehab task in this record. The model will use the pipe's average depth when calculating this cost.
  5. Click to save the record.
  6. Click to exit Add Mode.   
  7. Click to close the window.
  8. You can then use the functions in the grid to View, Edit, and Delete records as needed.

See Also

Rehab Work Tasks and Costs

Work Task Header Data

Default Task Cost