Attribute 2 Tab

The Attributes 2 tab stores information about the connection, as well related cleanings, inspections, risk, and value. The tab also stores GIS/GPS information and displays related Construction records.

Cleaning Fields

Last Cleaning Date

Date of most recent cleaning.

Next Cleaning Date

Date of next scheduled cleaning. The date can be entered manually or auto-calculated based on the Clean Freq and Cleaning Freq Units fields.

Cleaning Freq

How often the pump station should be cleaned. The unit of time associated with this field is stored in the Cleaning Freq Units field.

Cleaning Freq Units

The unit of time the Cleaning Freq field refers to. (i.e.,: weeks, months, etc...)

Risk Calculation

Risk calculations are a way for agencies to evaluate where potential weak spots in their infrastructure are.

Criticality

Rates how important the asset is. This rating should be a whole number based on a scale that the agency uses. A higher number means more risk.

Example: On a scale of 1 to 100 this asset is pretty import so it has a Criticality score of 85.

Probability of Failure

Rates how likely the asset is to fail. This rating should be less than one because it represents a percentage.

Example: This asset will only fail about 5% of the time so it has a Probability of Failure of (5/100) = .05

Mitigation

Rates any factors that have been put into place to mitigate the failure of the asset. This rating should be less than one because it represents a percentage.

Example: To offset the failure of this asset we have a backup, though it will only make up for about 30% of the loss. This asset has a mitigation score of (30/100) = .3

Risk

Represents how much risk the asset represents. Calculated based on: (Consequence of Failure x Probability of Failure x Mitigation).

Example: This asset represents a 85 x .05 x .3 = 1.275 risk to the system.

Value Calculations

Present Value

Remaining Life

These fields are updated by the system based on deterioration rates set up up in the Construction record.

Construction Grid

This tab also contains a grid of all construction records associated with the service connection.

A sample of the grid appears below. Sort records in the grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

constgrid

To access Construction records, see Sewer > Construction Records.

More information about Construction records