The Construction tab allows agencies to document detailed information about the construction of the pipe. Additionally, this tab can document location information such as the benefit district, section, or township. Finally it has several fields for risk analysis and modeling.
Length Calculation
US Station DS Station |
If these fields are filled out then the Length field on the Attributes tab will automatically be calculated. |
Modeling and Risk Calculation
Ignore in Model |
Check this box to stop the Sewer Rehab model from selecting this pipe. |
Risk |
Calculated by |
Construction Grid
This tab also contains a grid of all construction records that are associated to the structure. The Sewer Structure's Present Value and Remaining Life are displayed above the grid. These are defined by the deterioration rates set up in the Construction record. These values are updated automatically by the system.
A sample of the grid appears below. Sort records in the grid by clicking on the headings. An up or down arrow (highlighted in orange below) will appear signifying ascending or descending order.
To access the Construction records go to Sewer > Construction Records
. For more information about Construction Records go here.