This tab contains fields that take the rehab cost and calculate extra costs based on known mark ups. For example it will always cost and additional 5% for traffic control. Use the fields on this tab to calculate extra costs. The tab also contains custom users fields
Field |
Function |
Base Rate |
Enter a base cost for the rehabilitation into this field. |
Contingency % |
Enter a number here for the percentage of contingency costs to add to the Base Rate. |
Traffic Control % |
Enter a number here for the percentage of traffic control costs to add to the Base Rate. |
Overhead % |
Enter a number here for the percentage of overhead costs to add to the Base Rate. |
Engineer and Inspection |
Enter a number here for the percentage of engineer and inspection costs to add to the Base Rate. |
Cost Date |
Enter the date these costs were set. |
Rehabilitation Cost |
This field is calculated based on:
|
The Custom tabs appear throughout the Lucity™ system. These tabs allows you to add custom information in multiple user-defined fields. These fields include:
Note: The Custom tab fields are designed by your system administrator. They are completely open from the beginning and have no default information to track. See your system administrator for further details.
The Custom tabs in some modules track additional information. This may include the following:
Note: You can only edit this field in the GIS geodatabase environment. If your system is not integrated with GIS, this field will not be available.