The header fields contain general information to help identify each testing. It appears the top of the module window and remains visible as users navigate through the module's tabs.
Field |
Function |
US Structure* |
Specifies which structure the pipe begins at. Click the US Structure button or click in the field and hit F9 to bring up a list of pipes from the Sewer Pipe module. If the Alt ID is selected this field is automatically populated. |
DS Structure |
Specifies which structure the pipe ends at. This field is auto-populated when either the US Structure or Alt ID are selected. |
Alt Pipe ID |
The pipes user defined ID. This can be used to select the pipe instead of the US Structure. Click the Alt Pipe ID button or click in the field and hit F9 to bring up a list of pipes from the Sewer Pipe module. If the US Structure is selected this field is automatically populated. |
Project ID |
This field allows users to link the inspection to a project in the Work Project Management System. Click the Project ID button or click in the field and hit F9 to bring up a list of projects from the Project module. Note: This is only enabled if the Integration with Work option is turned on in the Sewer Options module. |
Latest Inspection |
Automatically checked if this is the most recent inspection of this type for the pipe. |
* Required Field
Note: The combination of US Structure, and Tested Date on the General tab, must form a unique combination.