The Rehab tab fields enable users to document any rehabilitation that occurred as a result of the inspection. Each field is defined below:
Field Name |
Definition |
Min Rehab Priority |
The lowest Min Rehab Priority value found in any of the observations attached to this inspection (populated automatically). |
Rehab Method |
The technique used to rehab the pipe, as chosen from a code-description pick list. |
Rehab Cost |
The price of rehabilitation. |
Contingency Cost |
Enter any extra costs that might be incurred. |
Percent Flow Removed |
The total percent of flow removed due to the rehabilitation. The calculation is based on information from the Observation tab. Press F5 to calculate. |
Total Flow Removed |
The total amount of flow removed due to the rehabilitation. The calculation is based on information from the Observation tab. Press F5 to calculate. |
Cost Effectiveness |
The amount of flow restored for every dollar spent. Press F5 to calculate the cost effectiveness. Calculated as: Total Flow Removed / (Rehab Cost + Contingency Cost). |
Pipe Ranking |