Rehab Tab

The Rehab tab fields enable users to document any rehabilitation that occurred as a result of the inspection.  Each field is defined below:

Field Name

Definition

Min Rehab Priority

The lowest Min Rehab Priority value found in any of the observations attached to this inspection (populated automatically).

Rehab Method

The technique used to rehab the pipe, as chosen from a code-description pick list.

Rehab Cost

The price of rehabilitation.

Contingency Cost

Enter any extra costs that might be incurred.

Percent Flow Removed

The total percent of flow removed due to the rehabilitation. The calculation is based on information from the Observation tab.  Press F5 to calculate. 

Total Flow Removed

The total amount of flow removed due to the rehabilitation. The calculation is based on information from the Observation tab.  Press F5 to calculate.

Cost Effectiveness

The amount of flow restored for every dollar spent. Press F5 to calculate the cost effectiveness. 

Calculated as: Total Flow Removed / (Rehab Cost + Contingency Cost).

Pipe Ranking

This field is optional.

See Also

TV Inspection

TV Inspection Header Data

Set-up Tab

Pipes Tab

Data Tab

TV Observation Tab

Summary Tab

Custom Tab(s)

Comments Tab

Graph Function

Toolkit