Inspection Setup Tab

The Inspection Setup tab stores general inspection data, such as the inspection date, the inspection crew, purpose, prior maintenance, and overall pipe condition. Some fields in this tab have a unique purpose or are required to save the record. These are described in the table below:

Field Name

Use/Purpose

Date Inspected

 

Use this field to indicate the date the inspection took place.

Note: This field is required in order to save the record.

Inspection Direction

This field allows you to indicate the direction in which the inspection was performed (i.e. upstream to downstream or downstream to upstream).

Note: This field is required in order to save the record.

Tape ID

If a TV Inspection was performed, use this field to include the identification number of the tape.

Counter Start

Counter Stop

If a TV Inspection was performed, use these fields to include the numbers on the tape counter where the pipe inspection begins and ends.

Percent Full

Use this field to indicate what percentage of the pipe was full of water or debris.

Flow Depth

The total depth of liquid and obstructions, in inches, measured to the nearest quarter inch.

Debris Depth

The approximate depth of obstructions flowing/settling in the pipe, in inches.

Debris Type

The type of obstructions observed in the pipe during the inspection.

Flow Velocity

Flow speed in the pipe measured in feet per second.

Cleaning Rec

Use this field to indicate if the inspector recommends cleaning for the pipe.

Total Structure # Field

The Total Structure # field automatically sums all the assigned structure numbers from the Structure # field in each observation record. This number can then be used to determine the overall condition of the pipe.

Next Insp Date

The date for the next recommended inspection.

See Also

Pipe Inspections

Raw Water Pipe Inspection Header Data

Observations Tab

Custom Tab(s)

Comments Tab