Total Field Name |
Total Cost Calculation |
Total Normal Cost |
Normal Units * the Normal Unit Cost |
Total Regular Cost |
Regular Units * the Regular Unit Cost |
Total Overtime Cost |
Overtime Units * the Overtime Unit Cost |
Grand Total Cost |
The sum of the Normal Total Cost + Regular Total Cost + Overtime Total Cost = the Grand Total Cost for an individual resource. Note: For contractors, this equals the Total Normal Cost. |