The Construction tab allows users to document information regarding the conduit's construction information. This includes the construction date, the individual or company that designed the project, the contractor name, and project number. In addition, they can document the district and section/township/range in which this conduit resides. This is useful for additional location information. Some fields in this tab are unique to conduit construction. These are described in the table below:
Note: All of the fields in this tab are optional.
Index Number |
This field allows users to record a secondary conduit identifier. |
Land Use |
Use this field to indicate the land use in the area surrounding the conduit (i.e. residential, commercial, industrial). |
US Stationing DS Stationing |
These fields are provided to record the upstream and downstream structure stations as shown on the construction plans. |
Sub Area |
This is a secondary group or location identifier. |
Design Flow |
The flow rate the conduit was designed for. |
Average Depth |
The average depth of the conduit, in feet. |
HGL US Invert HGL DS Invert |
The hydraulic grade line at the upstream and downstream structures. |
Bedding Type |
Bedding refers to the material lying underneath the conduit in the ground (for example, dirt, gravel, sand) to provide better control of its environment. |
Maintenance Area |
Indicate if the conduit is located in a maintenance area of right-of-way. |
Joint Material |
The type of joint used at each pipe section. |
Pipe Sec Length (ft) |
The length of the pipe section or joint in feet. |