Pipe Individual Rehab Items

This grid identifies individual rehab tasks for the pipe highlighted in the Pipes in Project grid. To view a different pipe's rehab tasks, simply click on a different pipe in the previous grid.

A sample of the Pipe Individual Rehab Items grid appear below. It identifies tasks by repair number, task code, and task text. It also indicates whether the task was selected by the model run, the pipe's start and stop footage, pipe length, and estimated task cost.

Note: Only the rehab work tasks that were selected in the Pipe Analysis Details module will appear in the Project record.

Rehab Items

  1. To Add additional work tasks to the project, or View, Edit, or Delete existing tasks, right click on a listing in the grid and make your selection. A window similar to the following will appear:

    Pipe Repairs

  2. Use the fields provided to record the Repair #, Start and Stop footages, pipe Length, and Estimated Cost.
  3. The Work Task field allows you to select a Rehab Task from the pick list. This list comes from the Rehab Work Tasks and Costs module.
  4. The Task Selected checkbox is used to indicate if the work task was selected in the model run.
  5. You can record custom information in the user-defined fields at the bottom of the dialog. These fields include:
  6. Click to save the record.
  7. Click to exit Add Mode.   
  8. Click to close the window.