Pipe Work Tasks

The individual work tasks are displayed in the Pipe Work Tasks grid. These correspond with any Defects selected for rehabilitation in the Pipe Defects grid.

  1. Each selected task is identified by a repair number, task text, and start/stop location.

    Work Tasks

  2. Additionally, this grid displays the cost for each individual work task that was selected. You can choose to unselect tasks in this grid by right clicking on a task listing and selecting Unselect Task. If using the Rehab Projects module, this will serve to eliminate the work task from the Rehab Project.
  3. The system calculates all per task costs as well as all per pipe costs (cost to rehab the entire pipe). These costs are listed on the Summary tab for comparison. These should help you determine if it's more cost effective to rehab the entire pipe or rehab it on a task by task basis.