Construction Tab

The Construction tab allows agencies to document detailed information about the construction of the pump station.  Additionally, this tab has fields that track building value, and replacement costs, and several fields for risk analysis and modeling.

Value and Risk Calculations

Present Value

Remaining Life

These fields are updated by the system based on deterioration rates setup up in the Construction record.

Risk

Calculated by (Consequence of Failure x Probability of Failure).

Construction Grid

A sample of the grid appears below. Sort records in the grid by clicking on the headings.  An up or down arrow (highlighted in orange below) will appear signifying ascending or descending order.

constgrid

To access the Construction records go to Sewer > Construction Records. For more information about Construction Records go here.

See Also

Pump Stations Inventory

Sewer Pump Station Header Data

Attributes Tab

Pumps Tab

Costs Tab

Plates Tab

Pipes Tab

Other Equipment Tab

Inspections Tab

Readings Tab

WO/PM

Instruct

Custom and Comments