An Affected PM does not generate work based on time or meter readings. Instead, it generates work at the same time as another Scheduled PM to which it is linked. This enables you to create an initial PM that sets the schedule, while having an Affected PM that dictates work based on different criteria, tasks or assets.
An Affected PM is compatible with PMs using a Fixed Schedule, Floating Schedule, Meter Based Schedule or Mixed Schedule.
Setting up an Affected PM
You must have a Scheduled PM to link with an Affected PM.
How to add an Affected Schedule for a Standard PM
How to add an Affected Schedule for a Grouped/Grouped Asset PM