Split Process within Lucity Desktop
The following is an overview of the process that occurs within Lucity Desktop when Storm Conduits are split:
- Creates a new Storm Structure (if not using an existing Structure).
- Creates two new Storm Conduit records in Lucity Desktop.
- Copies attributes to new Conduit records
- Associates Documents with the new Conduit records (if not archiving).
- Updates the Multiple Conduits grid.
- If the Associate Inspections option is checked:
- Updates TV Inspections and Observations
- Updates Construction records (if the option was checked).
- Updates Illicit Discharge records (if options was checked).
- Updates new Upstream Elevations.
- Pulls Upstream Elevation data from the pre-split conduit's Upstream Elevation data.
- Does not calculate Downstream Elevation.
- Updates new Downstream Elevations.
- Does not calculate Upstream Elevation data.
- Pulls Downstream Elevation data from the pre-split conduit's Downstream Elevation data.
- Updates Work Requests (if the option was checked).
- Updates Work Orders (if the option was checked).
- Copies Asset/Task associations to the original conduit.
- Associates any previous asset costs AS_WOCOST and AS_UNASGNCOST with one of the conduits.
- Updates PM/Work Template records (if the option was checked).
- Updates Master Project records (if the option was checked).
- Archives or delete pre-split conduit (based upon archive option).