Acceptance Tab

The Acceptance tab displays two data grids: Pipe Air Tests and Pipe Mandrel Tests. This information allows users to track the tests that determine whether a pipe was installed correctly.

Pipe Air Tests Grid

This grid contains a list of all pipe air tests that were performed for the pipe.

A sample of the grid appears below. Sort records in each grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

Inspection_gtrap_grid

How to add a pipe air test

Pipe Mandrel Tests Grid

This grid contains a list of all pipe mandrel tests that were performed for the pipe.

A sample of the grid appears below. Sort records in each grid by clicking on the headings.  An up or down arrow indicates whether data appear in ascending or descending order.

mandrel_test_grid

How to add a pipe mandrel test