PACP Work Tasks per Defect Tab

The PACP Work Tasks per Defect tab contains a grid that stores additional selection criteria for the record. This data helps to determine the rehabilitation or replacement methods to be used when certain defects are observed in a PACP Pipe Inspection record. The method selected is based on the defect's Structural Rating or O&M Rating.

A sample of the PACP Work Tasks per Defect grid appears below. Sort records in the grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

pacp default work task

How To Add a PACP Task per Defect Record

  1. Right-click in the grid and select Add Record. The following window appears:

    Add Record

  2. Select a Defect (required). Click on the caption button or press F9 for a list of defects from the Inspection Setup module.
  3. For each defect, choose up to two Structural Work Tasks and up to two O&M Work Tasks and set minimum ratings to tell the model when to select these work tasks.
  4. Enter the minimum defect rating required to select a specific rehab task.
  5. Next to each Rating field is a Task field. Select the task that should be performed when the defect rating is greater than the minimum. Click on a field caption or press F9 for a pick list of tasks from the Rehab Work Tasks and Costs module.
  6. Save and close the record.

Example

To specify tasks for different ratings of a root defect, configure the model to Remove Roots for all defects with a Rating greater than 2, and Reline the Pipe for all defects with a Rating greater than 4.