The following modules are currently available in the Lucity Web program. Lucity introduces additional Web modules with each release and documents them the Release Notes.
Module |
Release Version |
Custom Inspection |
7.20 |
Custom Inventory |
7.20 |
Custom Inventory Contacts |
2015 |
Customer Accounts |
2014 |
Customer Addresses |
2104 R2 |
Customer Contacts |
2104 R2 |
Mobile Offline Caching Setup |
2104 R2 |
Mobile Offline Caching Setup Details |
2104 R2 |
Notification Setup |
2014 |
Parcels |
2104 R2 |
Street List Alias |
2104 R2 |
Street Name Directions |
2104 R2 |
Street Name List |
2104 R2 |
Street Name Prefixes |
2104 R2 |
Street Name Suffixes |
2104 R2 |
Street Name Types |
2104 R2 |
Module |
Release Version |
Survey Site Inspection Counts |
7.50 |
Survey Site Inspection Lab Tests |
7.50 |
Survey Site Inspections |
7.50 |
Survey Sites |
7.50 |
Module |
Release Version |
Construction Records |
2015 R2 |
Construction Asset Distribution |
2015 R2 |
Construction Locations |
2015 R2 |
Construction Assets |
2015 R2 |
Equipment Component Library |
2014 R2 |
Equipment Component Library Details |
2014 R2 |
Flow Isolations |
2015 R2 |
Flow Isolation Pipes |
2015 R2 |
Illicit Discharge |
2014 R2 |
Illicit Discharge Conversations |
2014 R2 |
Illicit Discharge Enforcement |
2014 R2 |
Illicit Discharge Enforcement Type |
2014 R2 |
Illicit Discharge Notifications |
2014 R2 |
Lateral Addresses |
7.40 |
Lateral Materials |
7.40 |
Lateral Observations |
7.40 |
MACP Additional Work |
7.40 |
MACP Conditions |
7.40 |
MACP Connections |
7.40 |
MACP Inspections |
7.40 |
MACP Recommendations |
7.40 |
Manhole Vacuum Testing |
7.40 |
Observation Manholes |
7.40 |
Pipe Air Testing |
7.40 |
Pipe Inventory |
7.40 |
Pipe Mandrel Testing |
7.40 |
Pump Inspection |
7.40 |
Pump Inventory |
7.40 |
Pump Location History |
7.40 |
Pump Status History |
7.40 |
Service Lateral Inspection |
7.40 |
Service Lateral Permits |
7.40 |
Service Laterals |
7.40 |
Sewer Building Inspections |
7.50 |
Sewer Building Observations |
7.50 |
Sewer Building Sump Inspections |
7.50 |
Sewer Control Valve Field Ties |
7.50 |
Sewer Control Valve Inspections |
7.50 |
Sewer Control Valves |
7.50 |
Sewer Flow Basin Outlets |
7.50 |
Sewer Flow Basins |
7.50 |
Sewer Inspection Setup |
2014 R2 |
Sewer Inspection Setup Cover Fit |
2014 R2 |
Sewer Inspection Setup Cover Type |
2014 R2 |
Sewer Inspection Setup Flow Per Hole |
2014 R2 |
Sewer Inspection Setup Inflow Dish |
2014 R2 |
Sewer Inspection Setup Ponding |
2014 R2 |
Sewer Inspection Setup Source Flow Rate |
2014 R2 |
Sewer Inspection Setup TV/Lamp Cleaning |
2014 R2 |
Sewer Inspection Setup TV/Lamp Infiltration |
2014 R2 |
Sewer Inspection Setup TV/Lamp Structural |
2014 R2 |
Sewer LACP Inspections |
7.50 |
Sewer LACP Observations |
7.50 |
Sewer LACP Recommendations |
7.50 |
Sewer Lamping Observations |
7.50 |
Sewer Line Lampings |
7.50 |
Sewer Node Field Ties |
7.50 |
Sewer Nodes |
7.50 |
Sewer Overflow Email Tracking |
7.50 |
Sewer Overflows |
7.40 |
Sewer PACP Inspections |
7.50 |
Sewer PACP Observations |
7.50 |
Sewer PACP Recommendations |
7.50 |
Sewer Pump Readings |
7.50 |
Sewer Pump Equipment Components |
2014 R2 |
Sewer Pump Station Costs |
7.50 |
Sewer Pump Station Equipment Components |
2014 R2 |
Sewer Pump Station Inspections |
7.50 |
Sewer Pump Station Pump History |
7.50 |
Sewer Pump Station Readings |
7.40 |
Sewer Pump Station Readings |
7.50 |
Sewer Pump Station Slots |
7.50 |
Sewer Pump Stations |
7.50 |
Sewer Pump Warranty |
7.40 |
Sewer Service Connections |
7.50 |
Sewer Service Lateral Permit Fee Setup |
7.50 |
Sewer Smoke Observations |
7.50 |
Sewer Smoke Tests |
7.50 |
Sewer Stream Sampling Checklist Setup |
2014 R2 |
Sewer Stream Sampling Checklist Setup Details |
2014 R2 |
Sewer Stream Sampling Inspection Details |
2014 R2 |
Sewer Stream Sampling Inspections |
2014 R2 |
Sewer System Valve Field Ties |
7.50 |
Sewer System Valve Inspections |
7.50 |
Sewer System Valves |
7.50 |
Sewer TV Additional Work |
7.50 |
Sewer TV Inspections |
7.50 |
Sewer TV Observations |
7.50 |
Structure Inspection |
7.30 |
Structure Inventory |
7.30 |
TV Additional Work |
7.40 |
Module |
Release Version |
Construction Asset Distribution |
2015 R2 |
Construction Assets |
2015 R2 |
Construction Locations |
2015 R2 |
Construction Records |
2015 R2 |
Equipment Component Library |
2014 R2 |
Equipment Component Library Details |
2014 R2 |
Detention Basin Calculations |
7.40 |
Detention Basin Features |
7.40 |
Conduit Inspection Observations |
7.50 |
Conduit Inspections |
7.50 |
Conduits |
7.50 |
Control Valve Field Ties |
7.50 |
Control Valve Inspections |
7.50 |
Control Valves |
7.50 |
Detention Basin Inspection |
7.40 |
Detention Basins |
7.40 |
Discharge Point Inspections |
7.50 |
Discharge Points |
7.50 |
Illicit Discharge Conversations |
7.50 |
Illicit Discharge Enforcement Types |
7.50 |
Illicit Discharge Enforcements |
7.50 |
Illicit Discharge Notifications |
7.50 |
Illicit Discharges |
7.50 |
MACP Additional Work |
2014 |
MACP Conditions |
2014 |
MACP Connections |
2014 |
MACP Inspections |
2014 |
MACP Recommendations |
2014 |
Multi Conduits |
7.50 |
Node Field Ties |
7.50 |
Nodes |
7.50 |
PACP Inspections |
7.50 |
PACP Observations |
7.50 |
PACP Recommendations |
7.50 |
Pump Equipment Components |
2014 R2 |
Pump Inspections |
7.50 |
Pump Location History |
7.50 |
Pump Readings |
7.50 |
Pump Station Costs |
7.50 |
Pump Station Equipment Components |
2014 R2 |
Pump Station Inspections |
7.50 |
Pump Station Pump History |
7.50 |
Pump Station Readings |
7.50 |
Pump Station Slots |
7.50 |
Pump Stations |
7.50 |
Pump Status History |
7.50 |
Pump Warranties |
7.50 |
Pumps |
7.50 |
Sampling Component List Results |
7.50 |
Sampling Component List Setup |
7.50 |
Sampling Component List Setup Details |
7.50 |
Samplings |
7.50 |
Structure Inlets |
7.50 |
Structure Inspections |
7.50 |
Structures |
7.20 |
System Valve Field Ties |
7.50 |
System Valve Inspections |
7.50 |
System Valves |
7.50 |
Weirs |
2014 |
Weirs Readings and Inspections |
2014 |
Storm BMPs
Module |
Release Version |
BMP Assets |
2014 |
BMP Asset Corrective Actions |
2014 |
BMP Asset Inspections |
2014 |
BMP Asset Inspection Checklist Items |
2014 |
BMP Asset Inspection Corrective Actions |
2014 |
BMP Asset Inspection Notices and Violations |
2014 |
BMP Asset Items |
2014 |
BMP Asset Items Inspections |
2014 |
BMP Asset Milestones |
2014 |
BMP Asset Milestone History |
2014 |
BMP Asset Notices and Violations |
2014 |
BMP Asset Tests |
2014 |
BMP Asset Testing Lists |
2014 |
BMP Checklist Setup |
2014 |
BMP Checklist Setup and Details |
2014 |
BMP Corrective Action Setup |
2014 |
BMP Geological Survey |
2014 |
BMP Milestone Library |
2014 |
BMP Milestone Library Details |
2014 |
BMP Sites |
2014 |
BMP Site Contacts |
2014 |
BMP Site Conversations |
2014 |
BMP Site Corrective Actions |
2014 |
BMP Site Notices and Violations |
2014 |
BMP Email Tracking |
2014 |
BMP Site Notification History |
2014 |
BMP Stock Item Library |
2014 |
BMP Stock Library |
2014 |
BMP Stock Library Details |
2014 |
BMP Testing List Setup |
2014 |
BMP Testing List Setup Details |
2014 |
BMP Violation Setup |
2014 |
Water Quality
Module |
Release Version |
Commercial Contact Records |
2015 R2 |
Commercial Conversations |
2015 R2 |
Commercial Corrective Actions |
2015 R2 |
Commercial Inspection |
2015 R2 |
Commercial Inspection Checklist |
2015 R2 |
Commercial Inspection Corrective Actions |
2015 R2 |
Commercial Inspection Outreach |
2015 R2 |
Commercial Inspection Violations |
2015 R2 |
Commercial Inventory |
2015 R2 |
Commercial NAICS Codes |
2015 R2 |
Commercial Notifications |
2015 R2 |
Commercial Outreach |
2015 R2 |
Commercial SIC Codes |
2015 R2 |
Commercial Site BMP |
2015 R2 |
Commercial Site Conduits |
2015 R2 |
Commercial Site Detention Basins |
2015 R2 |
Commercial Site Structures |
2015 R2 |
Commercial Violations |
2015 R2 |
Construction Insp Corrective Actions |
2015 R2 |
Construction Inspection Checklist |
2015 R2 |
Construction Site BMP |
2015 R2 |
Construction Site Conduits |
2015 R2 |
Construction Site Contact Records |
2015 R2 |
Construction Site Conversations |
2015 R2 |
Construction Site Corrective Actions |
2015 R2 |
Construction Site Detention Basins |
2015 R2 |
Construction Site Inspection |
2015 R2 |
Construction Site Inspection Violations |
2015 R2 |
Construction Site Inventory |
2015 R2 |
Construction Site Notifications |
2015 R2 |
Construction Site Structures |
2015 R2 |
Construction Site Violations |
2015 R2 |
Corrective Action Setup |
2015 R2 |
Drainage Facility Summary |
2015 R2 |
Industrial Contact Records |
2015 R2 |
Industrial Conversations |
2015 R2 |
Industrial Corrective Actions |
2015 R2 |
Industrial Inspection |
2015 R2 |
Industrial Inspection Checklist |
2015 R2 |
Industrial Inspection Corrective Actions |
2015 R2 |
Industrial Inspection Outreach |
2015 R2 |
Industrial Inspection Violations |
2015 R2 |
Industrial Inventory |
2015 R2 |
Industrial NAICS Codes |
2015 R2 |
Industrial Notifications |
2015 R2 |
Industrial Outreach |
2015 R2 |
Industrial SIC Codes |
2015 R2 |
Industrial Site BMP |
2015 R2 |
Industrial Site Conduits |
2015 R2 |
Industrial Site Detention Basins |
2015 R2 |
Industrial Site Structures |
2015 R2 |
Industrial Violations |
2015 R2 |
Inspection Checklist Setup |
2015 R2 |
Inspection Checklist Setup Details |
2015 R2 |
Management Plan |
2015 R2 |
Management Plan BMP |
2015 R2 |
Management Plan Conduits |
2015 R2 |
Management Plan Contact Records |
2015 R2 |
Management Plan Conversations |
2015 R2 |
Management Plan Corrective Actions |
2015 R2 |
Management Plan Detention Basins |
2015 R2 |
Management Plan Insp Corrective Actions |
2015 R2 |
Management Plan Inspection |
2015 R2 |
Management Plan Inspection BMP Insp |
2015 R2 |
Management Plan Inspection Checklist |
2015 R2 |
Management Plan Inspection Violations |
2015 R2 |
Management Plan Notifications |
2015 R2 |
Management Plan Structures |
2015 R2 |
Management Plan Violations |
2015 R2 |
Municipal BMP |
2015 R2 |
Municipal Conduits |
2015 R2 |
Municipal Contact Records |
2015 R2 |
Municipal Conversations |
2015 R2 |
Municipal Corrective Actions |
2015 R2 |
Municipal Detention Basins |
2015 R2 |
Municipal Inspection |
2015 R2 |
Municipal Inspection Checklist |
2015 R2 |
Municipal Inspection Corrective Actions |
2015 R2 |
Municipal Inspection Violations |
2015 R2 |
Municipal Inventory |
2015 R2 |
Municipal Notifications |
2015 R2 |
Municipal Structures |
2015 R2 |
Municipal Violations |
2015 R2 |
Public Education Information |
2015 R2 |
Spill Review Summary |
2015 R2 |
Street Sweeping Summary |
2015 R2 |
Violation Setup |
2015 R2 |
Sewer FOG
Module |
Release Version |
Sewer FOG Corrective Action Setup |
7.40 |
Sewer FOG Disposal Fee Setup |
7.50 |
Sewer FOG Facility |
7.40 |
Sewer FOG Facility Contacts |
7.40 |
Sewer FOG Facility Conversations |
7.40 |
Sewer FOG Facility Corrective Actions |
7.40 |
Sewer FOG Facility Email Tracking |
7.40 |
Sewer FOG Facility Events |
2014 |
Sewer FOG Facility Inspection |
7.40 |
Sewer FOG Facility Inspection Checklist |
7.40 |
Sewer FOG Facility Inspection Corrective Actions |
7.40 |
Sewer FOG Facility Inspection Details |
7.40 |
Sewer FOG Facility Inspection Notices and Violations |
7.40 |
Sewer FOG Facility Maintenance Logs |
7.40 |
Sewer FOG Facility NAICS Codes |
7.40 |
Sewer FOG Facility Notices and Violations |
7.40 |
Sewer FOG Facility Notification History |
7.40 |
Sewer FOG Facility SIC Codes |
7.40 |
Sewer FOG Grease Extractor |
7.40 |
Sewer FOG Group Setup |
2014 |
Sewer FOG Group Event |
2014 |
Sewer FOG Hauler |
7.40 |
Sewer FOG Hauler Contacts |
7.40 |
Sewer FOG Hauler Drivers |
7.40 |
Sewer FOG Hauler Event |
2014 |
Sewer FOG Hauler Group Setup |
2014 |
Sewer FOG Hauler Group Event |
2014 |
Sewer FOG Hauler Pump Outs |
7.40 |
Sewer FOG Hauler Vehicles |
7.40 |
Sewer FOG Inspection Checklist |
7.40 |
Sewer FOG Inspection Checklist Items |
7.40 |
Sewer FOG PumpOut |
7.40 |
Sewer FOG Receiving Station |
7.40 |
Sewer FOG Receiving Station Contacts |
7.40 |
Sewer FOG Violation Setup |
7.40 |
Sewer FOG Waste Disposal |
7.40 |
Sewer IPT
Module |
Release Version |
Sewer IPT Category Setup |
2014 |
Sewer IPT Checklist Setup |
7.50 |
Sewer IPT Checklist Setup Details |
7.50 |
Sewer IPT Corrective Action Setup |
7.50 |
Sewer IPT Facilities |
7.50 |
Sewer IPT Facility Category Codes |
2014 |
Sewer IPT Facility Contacts |
7.50 |
Sewer IPT Facility Conversations |
7.50 |
Sewer IPT Facility Corrective Actions |
7.50 |
Sewer IPT Facility Events |
2014 |
Sewer IPT Facility Inspection Checklist Items |
7.50 |
Sewer IPT Facility Inspection Corrective Actions |
7.50 |
Sewer IPT Facility Inspection Notices and Violations |
7.50 |
Sewer IPT Facility Inspections |
7.50 |
Sewer IPT Facility Maintenance Logs |
7.50 |
Sewer IPT Facility Monitoring Points |
2014 |
Sewer IPT Facility Monitoring Point Parameters |
2014 |
Sewer IPT Facility NAICS Codes |
7.50 |
Sewer IPT Facility Notices and Violations |
7.50 |
Sewer IPT Facility Notification History |
7.50 |
Sewer IPT Facility SIC Codes |
7.50 |
Sewer IPT Facility Testing Test Lists |
7.50 |
Sewer IPT Facility Tests |
7.50 |
Sewer IPT Group Setup |
2014 |
Sewer IPT Group Event |
2014 |
Sewer IPT Monitoring Point Billing |
2014 |
Sewer IPT Testing List Setup |
7.50 |
Sewer IPT Testing List Setup Details |
7.50 |
Sewer IPT Testing Parameter Setup |
2014 |
Sewer IPT Violation Setup |
7.50 |
Storm BMPs
Module |
Release Version |
BMP Assets |
2014 |
BMP Asset Corrective Actions |
2014 |
BMP Asset Inspections |
2014 |
BMP Asset Inspection Checklist Items |
2014 |
BMP Asset Inspection Corrective Actions |
2014 |
BMP Asset Inspection Notices and Violations |
2014 |
BMP Asset Items |
2014 |
BMP Asset Items Inspections |
2014 |
BMP Asset Milestones |
2014 |
BMP Asset Milestone History |
2014 |
BMP Asset Notices and Violations |
2014 |
BMP Asset Tests |
2014 |
BMP Asset Testing Lists |
2014 |
BMP Checklist Setup |
2014 |
BMP Checklist Setup and Details |
2014 |
BMP Corrective Action Setup |
2014 |
BMP Geological Survey |
2014 |
BMP Milestone Library |
2014 |
BMP Milestone Library Details |
2014 |
BMP Sites |
2014 |
BMP Site Contacts |
2014 |
BMP Site Conversations |
2014 |
BMP Site Corrective Actions |
2014 |
BMP Site Notices and Violations |
2014 |
BMP Email Tracking |
2014 |
BMP Site Notification History |
2014 |
BMP Stock Item Library |
2014 |
BMP Stock Library |
2014 |
BMP Stock Library Details |
2014 |
BMP Testing List Setup |
2014 |
BMP Testing List Setup Details |
2014 |
BMP Violation Setup |
2014 |
Water Quality
Module |
Release Version |
Commercial Contact Records |
2015 R2 |
Commercial Conversations |
2015 R2 |
Commercial Corrective Actions |
2015 R2 |
Commercial Inspection |
2015 R2 |
Commercial Inspection Checklist |
2015 R2 |
Commercial Inspection Corrective Actions |
2015 R2 |
Commercial Inspection Outreach |
2015 R2 |
Commercial Inspection Violations |
2015 R2 |
Commercial Inventory |
2015 R2 |
Commercial NAICS Codes |
2015 R2 |
Commercial Notifications |
2015 R2 |
Commercial Outreach |
2015 R2 |
Commercial SIC Codes |
2015 R2 |
Commercial Site BMP |
2015 R2 |
Commercial Site Conduits |
2015 R2 |
Commercial Site Detention Basins |
2015 R2 |
Commercial Site Structures |
2015 R2 |
Commercial Violations |
2015 R2 |
Construction Insp Corrective Actions |
2015 R2 |
Construction Inspection Checklist |
2015 R2 |
Construction Site BMP |
2015 R2 |
Construction Site Conduits |
2015 R2 |
Construction Site Contact Records |
2015 R2 |
Construction Site Conversations |
2015 R2 |
Construction Site Corrective Actions |
2015 R2 |
Construction Site Detention Basins |
2015 R2 |
Construction Site Inspection |
2015 R2 |
Construction Site Inspection Violations |
2015 R2 |
Construction Site Inventory |
2015 R2 |
Construction Site Notifications |
2015 R2 |
Construction Site Structures |
2015 R2 |
Construction Site Violations |
2015 R2 |
Corrective Action Setup |
2015 R2 |
Drainage Facility Summary |
2015 R2 |
Industrial Contact Records |
2015 R2 |
Industrial Conversations |
2015 R2 |
Industrial Corrective Actions |
2015 R2 |
Industrial Inspection |
2015 R2 |
Industrial Inspection Checklist |
2015 R2 |
Industrial Inspection Corrective Actions |
2015 R2 |
Industrial Inspection Outreach |
2015 R2 |
Industrial Inspection Violations |
2015 R2 |
Industrial Inventory |
2015 R2 |
Industrial NAICS Codes |
2015 R2 |
Industrial Notifications |
2015 R2 |
Industrial Outreach |
2015 R2 |
Industrial SIC Codes |
2015 R2 |
Industrial Site BMP |
2015 R2 |
Industrial Site Conduits |
2015 R2 |
Industrial Site Detention Basins |
2015 R2 |
Industrial Site Structures |
2015 R2 |
Industrial Violations |
2015 R2 |
Inspection Checklist Setup |
2015 R2 |
Inspection Checklist Setup Details |
2015 R2 |
Management Plan |
2015 R2 |
Management Plan BMP |
2015 R2 |
Management Plan Conduits |
2015 R2 |
Management Plan Contact Records |
2015 R2 |
Management Plan Conversations |
2015 R2 |
Management Plan Corrective Actions |
2015 R2 |
Management Plan Detention Basins |
2015 R2 |
Management Plan Insp Corrective Actions |
2015 R2 |
Management Plan Inspection |
2015 R2 |
Management Plan Inspection BMP Insp |
2015 R2 |
Management Plan Inspection Checklist |
2015 R2 |
Management Plan Inspection Violations |
2015 R2 |
Management Plan Notifications |
2015 R2 |
Management Plan Structures |
2015 R2 |
Management Plan Violations |
2015 R2 |
Municipal BMP |
2015 R2 |
Municipal Conduits |
2015 R2 |
Municipal Contact Records |
2015 R2 |
Municipal Conversations |
2015 R2 |
Municipal Corrective Actions |
2015 R2 |
Municipal Detention Basins |
2015 R2 |
Municipal Inspection |
2015 R2 |
Municipal Inspection Checklist |
2015 R2 |
Municipal Inspection Corrective Actions |
2015 R2 |
Municipal Inspection Violations |
2015 R2 |
Municipal Inventory |
2015 R2 |
Municipal Notifications |
2015 R2 |
Municipal Structures |
2015 R2 |
Municipal Violations |
2015 R2 |
Public Education Information |
2015 R2 |
Spill Review Summary |
2015 R2 |
Street Sweeping Summary |
2015 R2 |
Violation Setup |
2015 R2 |
Module |
Release Version |
Accident Contributing Factors |
2015 R2 |
Accident Data Management |
2015 R2 |
Accident Occupants |
2015 R2 |
Accident Pedestrians |
2015 R2 |
Accident Vehicles |
2015 R2 |
Accident Violations |
2015 R2 |
Accident Witnesses |
2015 R2 |
Auxiliary Equipment |
7.40 |
Auxiliary Equipment Inspection |
7.40 |
Bridge Inventory |
7.40 |
Bus Stop Inspection |
7.40 |
Bus Stop Inventory |
7.40 |
Cabling Conductor |
7.40 |
Cabling Conduit |
7.40 |
Construction Asset Distribution |
2015 R2 |
Construction Assets |
2015 R2 |
Construction Locations |
2015 R2 |
Construction Records |
2015 R2 |
Curb Inventory |
7.40 |
Fence Inventory |
7.40 |
Fiber Optic |
7.40 |
Guard Rail Inspection |
7.40 |
Guard Rail Inventory |
7.40 |
Intersection Network |
7.20 |
Intersection Leg Assignments |
2014 |
ITS Anti-Icing Equipment |
2015 R2 |
ITS Anti-Icing Pump Houses |
2015 R2 |
ITS Anti-Icing Pump Houses Action History |
2015 R2 |
ITS Automated Gates |
2015 R2 |
ITS Automated Gates Action History |
2015 R2 |
ITS Camera Locations |
2015 R2 |
ITS Camera Locations Action History |
2015 R2 |
ITS Communication Devices |
2015 R2 |
ITS Communication Devices Action History |
2015 R2 |
ITS Communications |
2015 R2 |
ITS Communications Action History |
2015 R2 |
ITS Dynamic Message Signs |
2015 R2 |
ITS Dynamic Message Signs Action History |
2015 R2 |
ITS Kiosk |
2015 R2 |
ITS Kiosk Action History |
2015 R2 |
ITS Portable Dynamic Message Sign |
2015 R2 |
ITS Portable Dynamic Message Sign Action History |
2015 R2 |
ITS Sensors |
2015 R2 |
ITS Sensors Action History |
2015 R2 |
ITS Weather Stations |
2015 R2 |
ITS Weather Stations Action History |
2015 R2 |
Junction Boxes |
7.40 |
Main Cabling Line |
7.40 |
Median Inventory |
7.40 |
Meter Boxes |
7.40 |
Modeling Year End Summary Results |
2014 R2 |
Pavement Budget Annual Details |
2014 R2 |
Pavement Budgets |
2014 R2 |
Pavement Budgets Active Techniques |
2014 R2 |
Pavement Conditions |
2014 |
Pavement Distresses |
2014 |
Pavement Distress Matchup |
2014 |
Pavement Fields |
2014 |
Pavement Markings |
7.40 |
Pavement Miscellaneous Costs |
2014 R2 |
Pavement Modeling Results Segments |
2014 R2 |
Pavement Modeling Results Subsegment |
2014 R2 |
Pavement Models |
2014 R2 |
Pavement Parameters |
2014 |
Pavement Rehab Techniques |
7.60 |
Pavement Severity Density Setup |
2014 R2 |
Pavement Standards |
2014 |
Pavement Structures Linked to Segments |
7.60 |
Planning Road Added Segments |
2015 |
Planning Road Years to Work |
2015 |
Planning Supersegment Added Segments |
2014 R2 |
Planning Supersegment Years to Work |
2014 R2 |
Planning Table Road |
2015 |
Planning Table Supersegment |
2014 R2 |
Pole Inspection |
7.30 |
Pole Inventory |
7.30 |
Preempt Signal |
7.40 |
Railroad Crossing Inventory |
7.40 |
Ramp Inventory |
7.40 |
Rehab per Pavement/Classifications |
2014 |
Road Assets |
2014 R2 |
Road Attributes |
2014 R2 |
Road Definitions |
2014 R2 |
Road Field Inspections |
2014 R2 |
Road Field Recommended Maintenance |
2014 R2 |
Road Maintenance |
2014 R2 |
Road Ramps |
2014 R2 |
Road Segment Traffic Volumes |
2014 R2 |
Road Segments |
2014 R2 |
Road Stationings |
2014 R2 |
Sign Inspection |
7.30 |
Sign Inventory |
7.30 |
Sign MUTCD Library |
7.60 |
Signal Controller Clock Event Day Programming |
7.40 |
Signal Controller Coordinated Phase And Service |
7.40 |
Signal Controller Coordination Permissives |
7.40 |
Signal Controller Cycle Offsets |
7.40 |
Signal Controller Detectors |
7.40 |
Signal Controller Force Off Phase |
7.40 |
Signal Controller Force Off Timing |
7.40 |
Signal Controller Lead Lag Mode |
7.40 |
Signal Controller Option Data |
7.40 |
Signal Controller Overlap Data |
7.40 |
Signal Controller Permissives |
7.40 |
Signal Controller Phase Sequencing |
7.40 |
Signal Controller Phase Timing |
7.40 |
Signal Controller Preempt Functions |
7.40 |
Signal Controller Preempt Phasing |
7.40 |
Signal Controller Service Plans |
7.40 |
Signal Controller Start Flash Phase Data |
7.40 |
Signal Controllers |
7.40 |
Signal Head Sections |
7.40 |
Signal Heads |
7.40 |
Snow Shoes |
7.40 |
Step Inventory |
7.40 |
Street Bridge Inspections |
7.50 |
Street Cabinet Accessories |
7.50 |
Street Cabinets |
7.50 |
Street Cabinet Warranties |
7.60 |
Street Culvert Inspection Recommendations |
2014 R2 |
Street Culvert Inspections |
2014 R2 |
Street Curb Inspection Problems |
7.50 |
Street Curb Inspection Repairs |
7.50 |
Street Curb Inspections |
7.50 |
Street Fence Inspections |
7.50 |
Street Field Recommended Maintenance |
2014 |
Street Furniture |
7.50 |
Street Furniture Inspections |
7.50 |
Street Landscape Area Inspections |
7.50 |
Street Landscape Areas |
7.50 |
Street Light Central Controller Inspections |
7.50 |
Street Light Central Controllers |
7.50 |
Street Light Circuits |
7.50 |
Street Light Inspections |
7.50 |
Street Light Library |
7.50 |
Street Lights |
7.50 |
Street Maintenance |
2014 |
Street Mast Arms |
7.50 |
Street Median Inspections |
7.50 |
Street Parking |
7.40 |
Street Parking Inspections |
7.50 |
Street Parking Stalls |
7.50 |
Street Pavement Marking Inspections |
7.50 |
Street Railroad Crossing Inspections |
7.50 |
Street Ramp Inspection Details |
7.50 |
Street Ramp Inspections |
7.50 |
Street Routes |
7.60 |
Street Routes to Segment links |
7.60 |
Street Segment Networks |
7.60 |
Street Structures |
7.60 |
Street Sidewalk Inspection Problems |
7.50 |
Street Sidewalk Inspection Repairs |
7.50 |
Street Sidewalk Inspections |
7.50 |
Street Sidewalks |
7.50 |
Street Signal Head Inspections |
7.50 |
Street Signal Inspections |
7.50 |
Street Signals |
7.50 |
Street Step Inspections |
7.50 |
Street Traffic Volume Segments |
2014 |
Street Traffic Volume Intersections |
2014 |
Street Traffic Volume Intersections Leg Counts |
2014 |
Street Traffic Volume Intersections Leg Count Details |
2014 |
Street Trail Inspections |
7.50 |
Street Trails |
7.50 |
Street Wall Inspections |
7.50 |
Subsegments |
2014 |
Supersegments |
2014 |
Traffic Detector |
7.40 |
Traffic Regulations |
7.60 |
Wall Inventory |
7.40 |
Module |
Release Version |
Access Roads |
2015 |
AMR |
7.30 |
AMR Inspection |
7.30 |
AMR Status History |
7.30 |
Automated Meter Reader Associations |
7.30 |
Backflow Inspection Companies |
7.30 |
Backflow Inspection Companies Licenses |
7.30 |
Backflow Inspection Companies Test Kits |
7.30 |
Backflow Library |
7.50 |
Backflow Notification History |
7.30 |
Backflow Prevent. Associations |
7.30 |
Backflow Prevent. Field Ties |
7.30 |
Backflow Preventer Tester Certifications |
7.30 |
Backflow Preventer Tracking |
7.30 |
Backflow Prevention |
7.30 |
Backflow Prevention |
7.40 |
Backflow Prevention Testers |
7.30 |
Benefit Districts |
2015 R2 |
Construction Asset Distribution |
2015 R2 |
Construction Assets |
2015 R2 |
Construction Locations |
2015 R2 |
Construction Records |
2015 R2 |
Control Valve |
7.30 |
Control Valve Associations |
7.30 |
Control Valve Field Ties |
7.30 |
Control Valve Inspection |
7.30 |
Direct Hydrant Flushing |
2016 |
Distribution Pump Station Readings |
7.30 |
Equipment Component Library |
2014 R2 |
Equipment Component Library Details |
2014 R2 |
Flow Meter Device |
7.30 |
Flow Meter Device Associations |
7.30 |
Flow Meter Device Status History |
7.30 |
Flow Meter Location |
7.30 |
Flow Meter Location |
7.40 |
Flow Meter Location Associations |
7.30 |
Flow Meter Location Field Ties |
7.30 |
Flow Meter Location Inspection |
7.30 |
Flow Meter Location Status History |
7.30 |
Flushing History Pipes |
2014 R2 |
Flushing Route Pipes |
2014 R2 |
Flushing Route Valves |
2014 R2 |
Gates |
2015 |
Hydrant Flow Test |
7.30 |
Hydrant Flow Test Flow Major Flow Rates |
7.30 |
Hydrant Flow Test Flow Pump Settings |
7.30 |
Hydrant Flow Test Flow Results |
7.30 |
Hydrant Flow Test Flow Results |
7.40 |
Hydrant Flow Test Flow Tank Settings |
7.30 |
Hydrant Inspection |
7.30 |
Hydrant Replacements |
2015 R2 |
Hydrants |
7.30 |
Hydrants Associations |
7.30 |
Hydrants Field Ties |
7.30 |
Loss |
7.20 |
Loss Associations |
7.30 |
Mainbreaks |
7.30 |
Mainbreaks Field Ties |
7.30 |
Node |
7.30 |
Node Associations |
7.30 |
Node Field Ties |
7.30 |
Pipe |
7.30 |
Pipe Associations |
7.30 |
Pump Equipment Components |
2014 R2 |
Pump Inspection |
7.30 |
Pump Location History |
7.30 |
Pump Readings |
7.40 |
Pump Station |
7.30 |
Pump Station Associations |
7.30 |
Pump Station Costs |
7.30 |
Pump Station Equipment Components |
2014 R2 |
Pump Station Inspection |
7.30 |
Pump Station Location History |
7.30 |
Pump Station Slots |
7.30 |
Pump Status History |
7.30 |
Pumps |
7.30 |
Rights |
2015 R2 |
Rights History |
2015 R2 |
Sample Station Readings |
7.30 |
Sample Stations |
7.30 |
Service Tap Associations |
7.30 |
Service Tap Corporation |
7.30 |
Service Tap Field Ties |
7.30 |
Service Tap Material |
7.30 |
Service Tap Repair |
7.30 |
Service Tap Surfaces |
7.30 |
Service Taps |
7.30 |
Sites |
2014 R2 |
Storage Facility |
7.30 |
Storage Facility Associations |
7.30 |
Storage Facility Inspection |
7.30 |
Supply Source Inspection |
7.30 |
Supply Sources |
7.30 |
Supply Sources Associations |
7.30 |
System Valve |
7.30 |
System Valve Associations |
7.30 |
System Valve Field Ties |
7.30 |
System Valve Inspection |
7.30 |
Vault and Structure |
7.30 |
Vault Equipment Components |
2014 R2 |
Vault Structure Associations |
7.30 |
Vault Structure Field Ties |
7.30 |
Vault Structure Inspection |
7.30 |
Violation Notifications |
2014 R2 |
Violations |
2014 R2 |
Raw Water
Module |
Release Version |
AMR Inspections |
2014 R2 |
AMR Location History |
2015 |
AMR Status History |
2014 R2 |
AMRs |
2015 |
Automated Meter Reader Meter History |
7.60 |
Checks |
2015 |
Control Valve Associations |
2014 R2 |
Control Valve Field Ties |
2014 R2 |
Control Valves |
2014 R2 |
Control Valves Inspections |
2014 R2 |
Culverts |
2015 |
Flow Meter Tests |
7.60 |
Gauges |
2015 |
Main Break Field Ties |
2014 R2 |
Main Breaks |
2015 |
Meter Device Inspections |
2014 R2 |
Meter Device Location History |
2014 R2 |
Meter Device Status History |
2014 R2 |
Meter Devices |
2014 R2 |
Meter Location AMR History |
2015 |
Meter Location Associations |
7.30 |
Meter Location Field Ties |
2014 R2 |
Meter Location Inspections |
2014 R2 |
Meter Location Meter History |
2014 R2 |
Meter Location Status History |
2014 R2 |
Meter Locations |
2014 R2 |
Meter Device Automated Meter Reader History |
7.60 |
Node Associations |
7.30 |
Node Field Ties |
2014 R2 |
Nodes |
2014 R2 |
Pipe Associations |
7.30 |
Pipe Inspection Observations |
2014 R2 |
Pipe Inspections |
2014 R2 |
Pipes |
2014 R2 |
Pump Station Associations |
7.30 |
Pump Inspections |
2015 |
Pump Location History |
2015 |
Pump Readings |
2015 |
Pump Station Costs |
2015 |
Pump Station Inspections |
2015 |
Pump Station Location History |
2015 |
Pump Station Readings |
2014 R2 |
Pump Station Slots |
2015 |
Pump Stations |
2015 |
Pump Status History |
2015 |
Pump Warranties |
2015 |
Pumps |
2015 |
Service Boxes |
2015 |
Service Manifolds |
2015 |
Spills |
2015 |
Storage Facilities |
2015 |
Storage Facilities Associations |
7.30 |
Storage Facility Inspections |
2014 R2 |
Structures |
2015 |
Supply Sources |
2015 |
Supply Sources Associations |
7.30 |
Supply Sources Inspections |
2014 R2 |
System Valve Associations |
7.30 |
System Valve Field Ties |
2014 R2 |
System Valves Inspections |
2014 R2 |
System Valves |
2014 R2 |
Vault Associations |
7.30 |
Vault Field Ties |
2014 R2 |
Vault Inspections |
2014 R2 |
Vaults |
2014 R2 |
Recycled Water
Module |
Release Version |
AMR Inspections |
2015 |
AMR Location History |
2015 |
AMR Status History |
2015 |
AMRs |
2015 |
Control Valves Associations |
7.30 |
Control Valve Field Ties |
2015 |
Control Valve Inspections |
2015 |
Control Valves |
2015 |
Flow Meter Tests |
2015 |
Hydrant Associations |
7.30 |
Hydrant Field Ties |
2015 |
Hydrant Flow Test Flow Results |
2015 |
Hydrant Flow Test Major Flow Rates |
2015 |
Hydrant Flow Test Pump Settings |
2015 |
Hydrant Flow Test Tank Settings |
2015 |
Hydrant Flow Tests |
2015 |
Hydrant Inspections |
2015 |
Hydrants |
2015 |
Main Break Field Ties |
2015 |
Main Breaks |
2015 |
Meter Device Inspections |
2015 |
Meter Device Location History |
2015 |
Meter Device Status History |
2015 |
Meter Devices |
2015 |
Meter Location AMR History |
2015 |
Meter Location Associations |
7.30 |
Meter Location Device History |
2015 |
Meter Location Field Ties |
2015 |
Meter Location Inspections |
2015 |
Meter Location Status History |
2015 |
Meter Locations |
2015 |
Node Associations |
7.30 |
Node Field Ties |
2015 |
Nodes |
2015 |
Pipe Associations |
7.30 |
Pipes |
2015 |
Pump Inspections |
2015 |
Pump Location History |
2015 |
Pump Readings |
2015 |
Pump Station Associations |
7.30 |
Pump Station Costs |
2015 |
Pump Station Inspections |
2015 |
Pump Station Location History |
2015 |
Pump Station Readings |
2015 |
Pump Station Slots |
2015 |
Pump Stations |
2015 |
Pump Status History |
2015 |
Pump Warranties |
2015 |
Pumps |
2015 |
Service Tap Associations |
7.30 |
Service Tap Field Ties |
2015 |
Service Tap Materials |
2015 |
Service Tap Repairs |
2015 |
Service Tap Surfaces |
2015 |
Service Taps |
2015 |
Storage Facilities |
2015 |
Storage Facilities Associations |
7.30 |
Storage Facility Inspections |
2015 |
Supply Sources Associations |
7.30 |
Supply Source Inspections |
2015 |
Supply Sources |
2015 |
System Valve Associations |
7.30 |
System Valve Field Ties |
2015 |
System Valves |
2015 |
System Valves Inspections |
2015 |
Vault Inventory Associations |
7.30 |
Vault Field Ties |
2015 |
Vault Inspections |
2015 |
Vaults |
2015 |
Module |
Release Version |
Aerial Marker Inspections |
2015 R2 |
Aerial Markers |
2015 R2 |
Anchor Guy Inspections |
2015 R2 |
Anchor Guys |
2015 R2 |
Assemblies |
2015 R2 |
Assembly Inspections |
2015 R2 |
Bus Bars |
2015 R2 |
Capacitor Bank Unit History |
2015 R2 |
Capacitor Banks |
2015 R2 |
Capacitor Control Inspections |
2015 R2 |
Capacitor Controls |
2015 R2 |
Capacitor Unit Bank History |
2015 R2 |
Capacitor Unit Inspections |
2015 R2 |
Capacitor Unit Series Location History |
2015 R2 |
Capacitor Units |
2015 R2 |
Circuit Breaker Inspections |
2015 |
Circuit Breakers |
2015 |
Circuit Sources |
2015 R2 |
Communication Cables |
2015 R2 |
Conduits |
2015 R2 |
Fault Current Limiters |
2015 R2 |
Fault Indicators |
2015 R2 |
Fault Interrupter Inspections |
2015 R2 |
Fault Interrupters |
2015 R2 |
Fuse Location Unit History |
2015 R2 |
Fuse Locations |
2015 R2 |
Fuse Unit Inspections |
2015 R2 |
Fuse Unit Location History |
2015 R2 |
Fuse Units |
2015 R2 |
Generator Inspections |
2015 R2 |
Generators |
2015 R2 |
Grounds |
2015 R2 |
Induction Motor Inspections |
2015 R2 |
Induction Motors |
2015 R2 |
Joint Use Attachment Inspections |
2015 R2 |
Joint Use Attachments |
2015 R2 |
Load Tap Control Inspections |
2015 R2 |
Load Tap Controls |
2015 R2 |
Meter Inspections |
2015 |
Meters |
2015 |
Network Protector Inspections |
2015 R2 |
Network Protectors |
2015 R2 |
Open Points |
2015 R2 |
Primary Overhead Line Segments |
2015 R2 |
Primary Underground Line Segments |
2015 R2 |
Push Brace Inspections |
2015 R2 |
Push Braces |
2015 R2 |
Recloser Electronic Control Inspections |
2015 R2 |
Recloser Electronic Controls |
2015 R2 |
Recloser Hydraulic Control Inspections |
2015 R2 |
Recloser Hydraulic Controls |
2015 R2 |
Recloser Location Unit History |
2015 R2 |
Recloser Locations |
2015 R2 |
Recloser Unit Inspections |
2015 R2 |
Recloser Unit Location History |
2015 R2 |
Recloser Units |
2015 R2 |
Regulator Control Inspections |
2015 R2 |
Regulator Controls |
2015 R2 |
Relay Control Inspections |
2015 |
Relay Controls |
2015 |
Riser Inspections |
2015 R2 |
Risers |
2015 R2 |
Secondary Overhead Line Segments |
2015 R2 |
Secondary Underground Line Segments |
2015 R2 |
Sectionalizer Electronic Control Inspections |
2015 R2 |
Sectionalizer Electronic Controls |
2015 R2 |
Sectionalizer Hydraulic Control Inspections |
2015 R2 |
Sectionalizer Hydraulic Controls |
2015 R2 |
Sectionalizer Location Unit History |
2015 R2 |
Sectionalizer Locations |
2015 R2 |
Sectionalizer Unit Inspections |
2015 R2 |
Sectionalizer Unit Location History |
2015 R2 |
Sectionalizer Units |
2015 R2 |
Series Capacitor Location Unit History |
2015 R2 |
Series Capacitor Locations |
2015 R2 |
Shunt Reactors |
2015 R2 |
Span Guy Inspections |
2015 R2 |
Span Guys |
2015 R2 |
Station Inspections |
2015 |
Stations |
2015 |
Street Light Inspections |
2015 R2 |
Street Light Library |
2015 R2 |
Street Lights |
2015 R2 |
Support Structure Inspections |
2015 R2 |
Support Structures |
2015 R2 |
Surface Structure Inspections |
2015 R2 |
Surface Structures |
2015 R2 |
Surge Arrestors |
2015 R2 |
Switch Location Unit History |
2015 R2 |
Switch Locations |
2015 R2 |
Switch Unit Inspections |
2015 R2 |
Switch Unit Location History |
2015 R2 |
Switch Units |
2015 R2 |
Switching Station Inspections |
2015 R2 |
Switching Stations |
2015 R2 |
Synchronous Motor Inspections |
2015 R2 |
Synchronous Motors |
2015 R2 |
Transformer Bank Inspections |
2015 |
Transformer Banks |
2015 |
Transformer Locations |
2015 |
Transformer Location Unit History |
2015 R2 |
Transformer Unit Inspections |
2015 R2 |
Transformer Unit Location History |
2015 R2 |
Transformer Units |
2015 R2 |
Underground Structure Inspections |
2015 R2 |
Underground Structures |
2015 R2 |
Voltage Regulator Location Unit History |
2015 R2 |
Voltage Regulator Locations |
2015 R2 |
Voltage Regulator Unit Inspections |
2015 R2 |
Voltage Regulator Unit Location History |
2015 R2 |
Voltage Regulator Units |
2015 R2 |
Warning Sign Inspections |
2015 R2 |
Warning Signs |
2015 R2 |
Module |
Release Version |
Art Inspection Checklist |
2014 R2 |
Art Inspections |
2014 R2 |
Art Inventory |
2014 R2 |
Construction Asset Distribution |
2015 R2 |
Construction Assets |
2015 R2 |
Construction Locations |
2015 R2 |
Construction Records |
2015 R2 |
Controller Associations |
7.30 |
Controller Inspection |
7.20 |
Controller Inventory |
7.20 |
Court Associations |
7.30 |
Court Inspection |
7.20 |
Court Inspection Checklist |
2014 R2 |
Court Inventory |
7.20 |
Fence Inspection |
7.20 |
Fence Inspection Checklist |
2014 R2 |
Fence Inventory |
7.20 |
Field Associations |
7.30 |
Fields Inspection |
7.20 |
Fields Inspection Checklist |
2014 R2 |
Fields Inventory |
7.20 |
Furniture Associations |
7.30 |
Furniture Inspection |
7.20 |
Furniture Inspection Checklist |
2014 R2 |
Furniture Inventory |
7.20 |
Landscape Associations |
7.30 |
Landscape Inspection |
7.20 |
Landscape Inspection Checklist |
2014 R2 |
Landscape Inventory |
7.20 |
Lighting Associations |
7.30 |
Lighting Inspection |
7.20 |
Lighting Inspection Checklist |
2014 R2 |
Lighting Inventory |
7.20 |
Modular Equipment |
7.20 |
Meter Associations |
7.30 |
Meter Consumption History |
2014 R2 |
Meter Consumption Library |
2014 R2 |
Meters |
7.20 |
Parcels |
7.20 |
Pools |
7.20 |
Refuse |
7.20 |
Parking Lot Associations |
7.30 |
Parking Lot Inspection |
7.20 |
Parking Lot Inventory |
7.20 |
Parks |
7.20 |
Park Inspection Checklist Setup |
2014 R2 |
Park Inspection Checklist Setup Details |
2014 R2 |
Irrigation Controller Inspection Checklist |
2014 R2 |
Irrigation Nodes |
2014 R2 |
Irrigation Pipes |
2014 R2 |
Irrigation Valve Inspection Checklist |
2014 R2 |
Path Associations |
7.30 |
Path Features |
7.20 |
Path Inspection |
7.20 |
Path Inspection Problems |
7.20 |
Path Inspection Checklist |
2014 R2 |
Path Inventory |
7.20 |
Playground Equipment Associations |
7.30 |
Playground Equipment Inspection |
7.20 |
Playground Equipment Inspection Checklist |
2014 R2 |
Playground Equipment Inventory |
7.20 |
Playground Inspection |
7.20 |
Playground Inspection Checklist |
2014 R2 |
Playground Inventory |
7.20 |
Pool Appurtenance Inspection |
7.20 |
Pool Appurtenance Inspection Checklist |
2014 R2 |
Pool Appurtenance Inventory |
7.20 |
Pool Associations |
7.30 |
Pool Inspection |
7.20 |
Pool Inspection Checklist |
2014 R2 |
Pool Site Inspection |
7.20 |
Pool Site Inspection Checklist |
2014 R2 |
Pool Site Inventory |
7.20 |
Refuse Associations |
7.30 |
Structure Associations |
7.30 |
Structures Inspection |
7.20 |
Structure Inspection Checklist |
2014 R2 |
Structures Inventory |
7.20 |
Tree Associations |
7.50 |
Tree Code Setup |
7.40 |
Tree Inspections |
7.50 |
Tree Plantings |
7.50 |
Trees |
7.50 |
Valve Associations |
7.30 |
Valve Inspection |
7.20 |
Valve Inventory |
7.20 |
Module |
Release Version |
Fleet Component |
7.00 |
Fleet Component Warranty |
7.00 |
Fleet Cost |
7.00 |
Fleet Fuelings |
7.00 |
Fleet Hour Rollback |
7.00 |
Fleet Insurance Cost |
7.00 |
Fleet Inventory |
7.00 |
Fleet Odometer Rollback |
7.00 |
Fleet OtherMeter Rollback |
7.00 |
Fleet Status |
7.00 |
Fleet SubComponent |
7.00 |
Fleet SubComponent Warranty |
7.00 |
Fleet Task |
7.00 |
Fleet Tracking |
7.30 |
Fleet Warranty |
7.00 |
Other Fueling Fluids |
7.00 |
Tires |
2015 R2 |
Tire Caps |
2015 R2 |
Tire Vehicle History |
2015 R2 |
Travel Log |
7.00 |
Equipment
Module |
Release Version |
Equipment Component |
7.00 |
Equipment Component Library |
2014 |
Equipment Component Library Details |
2014 |
Equipment Cost |
7.00 |
Equipment Dependent |
7.00 |
Equipment Fluids |
7.00 |
Equipment Hour Rollback |
7.00 |
Equipment Inspection |
7.00 |
Equipment Inspection Thresholds |
2014 |
Equipment Insurance Cost |
7.00 |
Equipment Inventory |
7.00 |
Equipment Linked Pumps |
7.40 |
Equipment OtherMeter Rollback |
7.00 |
Equipment Parent |
7.00 |
Equipment Parts |
7.00 |
Equipment Readings |
7.00 |
Equipment Status |
7.00 |
Equipment Task |
7.40 |
Equipment Thresholds |
2014 |
Equipment Threshold Library |
2014 |
Equipment Threshold Library Details |
2014 |
Equipment Warranty |
7.00 |
Plants
Plant |
2014 |
Plant Process |
2014 |
Plant Process Dependents |
2016 |
Plant Process Slots |
2014 R2 |
Plant Process Slot History |
2014 R2 |
Shared Modules
Manufacturer Library |
7.00 |
Warranty |
7.00 |
Module |
Release Version |
Building Inspection |
7.20 |
Building Inventory |
7.20 |
Building Inventory Costs |
7.20 |
Building Inventory Paint |
7.20 |
Building Warranty |
7.20 |
Door Inventory |
7.20 |
Facility Building Assessments |
7.50 |
Facility Building Asset Inspections |
7.50 |
Facility Building Assets |
7.50 |
Facility Building Utility Account Number Defaults |
7.60 |
Facility Door Inspections |
7.50 |
Facility Floor Asset Inspections |
7.50 |
Facility Floor Assets |
7.50 |
Facility Lease Amendments |
7.50 |
Facility Lease Payments |
7.50 |
Facility Lease Responsibilities |
7.50 |
Facility Lease Subleases |
7.50 |
Facility Lease Tenant Improvements |
7.50 |
Facility Leases |
7.50 |
Facility Property Taxes |
2014 |
Facility Property Tax Payments |
2014 |
Facility Property Tax Mill Taxes |
2014 |
Facility Roof Asset Inspections |
7.50 |
Facility Roof Assets |
7.50 |
Facility Room Asset Inspections |
7.50 |
Facility Room Assets |
7.50 |
Facility Sublease Amendments |
7.50 |
Facility Sublease Payments |
7.50 |
Facility Sublease Responsibilities |
7.50 |
Facility Sublease Tenant Improvements |
7.50 |
Facility Valuations |
2014 |
Floor Inventory |
7.20 |
Floor Warranty |
7.20 |
Furnishing Inventory |
7.20 |
Furnishing Warranty |
7.20 |
Roof Inspection |
7.20 |
Roof Inventory |
7.20 |
Roof Warranty |
7.20 |
Room Inventory |
7.20 |
Room Inventory Paint |
7.20 |
Room Warranty |
7.20 |
Site Asset Inspection |
7.20 |
Site Asset Inventory |
7.20 |
Site Asset Warranty |
7.20 |
Site Inspection |
7.20 |
Site Inventory |
7.20 |
Site Inventory Parcels |
7.20 |
Site Utility Account Number Defaults |
7.60 |
Site Warranty |
7.20 |
Utility |
7.40 |
Utility Buildings |
7.40 |
Utility Sites |
7.40 |
Module |
Release Version |
Solid Wastes |
2014 |
Solid Waste Routes |
2014 |
Solid Waste Containers |
2014 |
Solid Waste Container Location History |
2104 R2 |
Solid Waste Container Pickup Rates |
2014 |
Solid Waste Linked Containers |
2014 |
Module |
Release Version |
Account Numbers |
2015 |
Activity Library |
2016 |
Activity Library Details |
2016 |
Alternate Zone Setup |
2015 |
Architect Engineers Setup |
7.40 |
Building Permit |
7.40 |
Building Permit Inspection |
7.40 |
Cause Setup |
2014 |
Cause Setup Categories |
2014 |
Contractor Setup |
7.40 |
Contractor Setup Categories |
2014 |
Cost Markup Library |
2014 |
Cost Markup Library Details |
2014 |
Crew Setup |
2014 |
Crew Setup Categories |
2014 |
Crew Setup Resource - Contractor |
2014 |
Crew Setup Resource - Employee |
2014 |
Crew Setup Resource - Equipment |
2014 |
Crew Setup Resource - Fluid |
2014 |
Crew Setup Resource - Material |
2014 |
Daily Inspection Bacti Tests |
2016 |
Daily Inspection Construction Activities |
2016 |
Daily Inspection Contractors |
2016 |
Daily Inspection Easements |
2016 |
Daily Inspection Equipment |
2016 |
Daily Inspection Staff |
2016 |
Daily Inspections |
2016 |
Employee Certification Employees |
2014 R2 |
Employee Certifications |
2014 R2 |
Employee Classes |
2014 R2 |
Employee Classes Employee Cost per Account |
2015 R2 |
Employee Classes Employees attending |
2015 R2 |
Employee Classification Setup |
2014 |
Employee Classification Setup Employees |
2014 |
Employee Setup |
2014 |
Employee Setup Availability |
2014 |
Employee Setup Categories |
2014 |
Employee Setup Equipment Usage |
2014 |
Employee Setup Timesheet Admin |
2014 |
Equipment Classification Setup |
2014 |
Equipment Classification Setup Equipment |
2014 |
Equipment Setup |
7.40 |
Equipment Setup |
7.40 |
Equipment Setup Availability |
2014 |
Equipment Setup Categories |
2014 |
Equipment Setup Employees |
2014 |
Exclusion Days |
2014 |
Fluid Setup |
2014 |
Fluid Setup Categories |
2014 |
Maintenance Zone Setup |
2015 |
Master Project Activities |
2016 |
Master Project Activity History |
2016 |
Master Project Management |
2016 |
Material Requisition |
2014 R2 |
Material Requisition Detail |
2014 R2 |
Material Setup |
2014 |
Material Setup Categories |
2014 |
Order Assets |
6.75 |
Permit Email Tracking |
7.40 |
Permit Type Setup |
7.60 |
Permits |
7.60 |
PM/Work Templates |
7.60 |
PM/Work Tracking |
2014 |
PO Details Linked to Projects |
2016 |
Problem Setup |
2014 |
Problem Setup Categories |
2014 |
Problem Setup Category Notifications |
2014 |
Problem Setup Maintenance Zone Supervisor |
2015 |
Problem Setup Notifications |
2014 |
Problem Setup Scripts |
2014 |
Programs |
2014 R2 |
Project Activity History |
2016 |
Project Budgets or Revenues |
2016 |
Project Contract Approval Library |
2016 |
Project Contract Approval Library Details |
2016 |
Project Contract Details |
2016 |
Project Contract Estimate Approvers |
2016 |
Project Contract Estimate Details |
2016 |
Project Contract Estimates |
2016 |
Project Contract Link to Projects |
2016 |
Project Contracts |
2016 |
Project Cost Centers |
2016 |
Project Expenditures |
2016 |
Project Grants |
2016 |
Project Invoice Details |
2016 |
Project Invoice Link to Purchase Orders |
2016 |
Project Invoice Payment Details |
2016 |
Project Invoice Payments |
2016 |
Project Invoices |
2016 |
Project Management |
2016 |
Project Numbers |
2015 |
Project Purchase Order Change Orders |
2016 |
Project Purchase Order Details |
2016 |
Project Purchase Orders |
2016 |
Project Subcontractors |
2016 |
Project Tasks |
2016 |
Project Tasks Sub-Tasks |
2016 |
Request Comments |
6.75 |
Request Notification Comments |
6.75 |
Request Notifications |
6.75 |
Request Scripts |
6.75 |
Request Tracking |
6.75 |
Requesters |
6.75 |
Requests |
6.75 |
Task Setup |
2014 |
Task Setup Categories |
2014 |
Task Setup Category Notifications |
2014 |
Task Setup Checklist |
2014 |
Task Setup Maintenance Zone Supervisor |
2016 |
Task Setup Related Tasks |
2014 |
Task Setup Resource - Contractor |
2014 |
Task Setup Resource - Employee |
2014 |
Task Setup Resource - Equipment |
2014 |
Task Setup Resource - Fluid |
2014 |
Task Setup Resource - Material |
2014 |
Task Setup Resulting Tasks |
2014 |
Task Setup Task Notifications |
2014 |
Task Setup Work Routing |
2014 |
Task Setup Work Routing Sub-Tasks |
2014 |
Time Cost Setup |
2014 |
Utility Checklist Setup |
7.60 |
Utility Locates |
7.60 |
Utility Members |
7.60 |
Utility Violation Setup |
7.60 |
Vendor Setup |
2014 R2 |
Water Loss |
7.60 |
Work Asset Setup |
2014 R2 |
Work Asset Setup Fields |
2014 R2 |
Work Order Checklist |
6.75 |
Work Order Comments |
6.75 |
Work Order Events |
6.75 |
Work Order Locations |
6.75 |
Work Order Resources - Contractors |
6.75 |
Work Order Resources - Employees |
6.75 |
Work Order Resources - Equipment |
6.75 |
Work Order Resources - Fluids |
6.75 |
Work Order Resources - Materials |
6.75 |
Work Order Resulting Tasks |
2015 R2 |
Work Order Tasks |
6.75 |
Work Order Tracking |
6.75 |
Work Orders |
6.75 |
Module |
Release Version |
Bar Coding Input Review |
15 |
Part Locations |
15 |
Part Purchase Orders |
15 |
Part Transactions |
15 |
Part Warehouses |
15 |
Parts |
15 |
Parts Hazard Codes |
15 |
Parts Inventory |
15 |
Parts Vendors |
15 |
Purchase Order Parts |
15 |
Purchase Order Receipt Details |
15 |
Purchase Order Receipts |
15 |
Vendor Parts |
15 |
Vendors |
15 |
Warehouse Location Parts |
15 |
Warehouse Security |
15 |