Split Process within the Desktop Application
The following is an overview of the split process within the desktop:
- Create a new storm structure (if not using an existing structure)
- Create two new storm conduit records in the desktop
- Copy attributes to new conduit records
- Associate documents to new conduit records (if not archiving)
- Update Multiple Conduits grid
- If Associate Inspections option is checked:
- Update TV inspection and observations
- Update Construction records (if option was checked)
- Update Illicit Discharge records (if options was checked)
- Update new upstream storm conduit elevations
- Upstream elevation data is populated from the pre-split conduit's upstream elevation data
- Downstream elevation data is not calculated.
- Update new downstream storm conduit elevations
- Upstream elevation data is not calculated
- Downstream elevation data is populated from the pre-split conduit's downstream elevation data
- Update Work Requests (if option was checked)
- Update Work Orders (if option was checked)
- Asset/Task associations are carried over to the merged conduit
- Any previous asset costs AS_WOCOST and AS_UNASGNCOST are only associated to one of the conduits
- Update PM/Work Template records (if option was checked)
- Update Master Project records (if option was checked)
- Archive or delete pre-split conduit (based upon archive option)