Acceptance Tab

The Acceptance tab tracks Structure Vacuum Tests, which are performed to determine if a structure has been built correctly.

Structure Vacuum Tests Grid

The grid in this tab shows all Structure Vacuum tests performed for the structure.

A sample of the grid appears below. Sort records in each grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

vacuum_testing_grid

How To Add a Structure Vacuum Test

  1. Right-click in the Structure Vacuum Test grid and select Add Record. The Structure Vacuum Testing module will open and display a new record.
  2. Enter the Tested Date.
  3. Complete other desired fields.
  4. Save and close the record.
  5. The new record will appear in the grid.

    Note: The Structure and Tested Date are required fields. Adding a record using this method will automatically complete the Structure field.

More information about the Structure Vacuum Testing module

See Also

Structure Inventory

Sewer Structure Header Data

Attributes Tab

Components Tab

Mapping/Construction Tab

Inspections Tab

MACP Tab

Overflows

WO/PMs/Requests

Instruct

Custom Tab(s)

Comments Tab