PM/Work Templates can be set up on various schedules. This is one of the scheduling structures. PM/Work Templates are scheduled in the WO Scheduling Tab for individual PMs. For grouped PMs, these schedules are set up in the Grouped PMs tab.
You may want to schedule a vehicle to have the oil changed every 3,000 miles or every 3 months (whichever comes first). In this case, you would want to base your PM schedule on the both the last end date and the meter readings. By setting up your PM schedule in this manner, you are telling the system to generate a PM work order based on whichever comes first: the mileage or the date.
Note: If you are scheduling a PM template based on meter readings, you should only associate one piece of fleet or equipment per record.
Complete the following steps to set up a floating schedule based on meter readings and the last end date:
Note: This field will be automatically updated with the work order's end date once the work order is completed.
Note: The Next Date field must be vacant before it can be automatically populated.
Note: You can also enter a current meter reading manually.
Note: Only one open work order per PM is allowed at a time. You must close the work order before the next PM can be generated.