Details Tab

The Details tab provides more specific information about the subsegment in relation to the model. Most of this information is carried down from the supersegment modeling results.

Field Name

Definition

Pavement Type

This code/description field displays the material used to pave the subsegment prior to rehabilitation.

Pavement Strength

This code/description field displays the strength of the pavement prior to rehabilitation.

Classification

This code/description field displays the functional classification of the street subsegment (i.e. residential, collector, etc.).

Rehab

This code/description field displays the rehabilitation method used on the supersegment if it was selected in the model run.

Rehab Group

This field is used to track the rehabilitation group. A rehab group can be set for similar techniques and then a certain percentage of the budget can be allocated to each individual rehab group.

Minimum Life

This field indicates the minimum life span of the rehab technique indicated above.

Next Rehab Year

If a minimum life was indicated, the system will calculate the next available rehab year in this field.

Surface After Maint

If this street was selected, the pavement surface will be reset to this type after the rehabilitation is complete. This is determined in the Rehab per Pavement/Classification module.

Rehab Post Count

This field reflects the new rehab group number after rehabilitation is complete. This may change if the pavement surface type changed during the rehabilitation.

Rehab Key Zone

This checkbox will be marked by the system if the supersegment was in a key zone based on its PCI. Key Zone streets have a higher rehabilitation priority.

Selected

This checkbox will be marked by the system if the supersegment was selected for rehabilitation in the model run.

Forced Skip Selection

This checkbox will be marked by the system if this supersegment was included in the Planning Table as a Forced Year to Work street and the "No Rehab Before" checkbox was marked. This would ensure that this street was not selected for rehabilitation prior to the forced year to work.

Forced Selection

This checkbox will be marked by the system if this supersegment was included in the Planning Table as a Forced Year to Work street.

Total Cost

This is the total cost of performing maintenance on this subsegment.

Backlog

This checkbox is marked if the supersegment's PCI fell below the Max Backlog PCI but it isn't selected because it would put the year over budget.

See Also

Subsegment Results

Subsegment Results Header Data