TV Insp Work Tasks per Defect Tab

The TV Insp Work Task per Defect tab stores additional selection criteria for the record. This data helps to determine which rehabilitation or replacement methods are used when certain defects are observed in a TV Inspection record. The model selects a method based on the defect's Structural Rating or O&M Rating.

A sample of the TV Insp Work Task per Defect grid appears below. Sort records in the grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

pacp default work task

How To Add a TV Insp Task per Defect Record

  1. Right-click in the grid and select Add Record. The following window appears:

    TV

  2. Select a Defect (required). Click on the caption button or press F9 for a list of defects from the the Inspection Setup module.
  3. For each defect, choose up to two Structural Work Tasks and up to two O&M Work Tasks and set the minimum ratings that will trigger these tasks.
  4. Enter the minimum defect rating required to select a specific rehab task.
  5. Next to each Rating field is a Task field. Select the task that should be performed when the defect rating is greater than the minimum. Click on a field caption or press F9 for a pick list of tasks from the Rehab Work Tasks and Costs module.
  6. Save and close the record.

See Also

Default Rehab Work Tasks

Rehab Work Tasks Header Data

PACP Work Tasks per Defect Tab