Costs Tab

The Costs tab is used to track costs associated with pump stations.

A sample of the grid appears below. Sort records in the grid by clicking on the headings.  An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.

Pump Station Costs

How To Add a Cost Record

  1. Right-click in the grid and select Add Record. The following pop-up window will appear:

    Pump_station_cost

  2. Fill out the Cost Desc field (required).
  3. Complete other desired fields.
  4. Save and close the pop-up window.

In This Section

Costs Grid

Associations Grid

See Also

Pump Station

Water Pump Station Header Data

Attributes Tab

Pumps Tab

Plates Tab

Other Equipment Tab

Inspections Tab

Readings Tab

Construction Tab

WO/PMs/Requests

Custom Tab(s)

Comments Tab