The Rehab tab fields allow you to document any rehabilitation that occurred as a result of the inspection. Each field is defined below:
Field Name |
Definition |
Min Rehab Priority |
This field is populated with the lowest Min Rehab Priority value found in any of the observations attached to this inspection. |
Rehab Method |
This field uses a code-description pick list allowing you to specify the rehabilitation method. |
Rehab Cost |
Here, you can enter the cost of rehabilitation. |
Contingency Cost |
Here, you can enter any impending costs. |
Percent Flow Removed |
This is a calculated field based on the information in the Observation tab. Press F5 to calculated the total percent of flow removed due to the rehabilitation. Note: You must be in Edit Mode for the calculations to be performed. |
Total Flow Removed |
This is a calculated field based on information in the Observation tab. Press F5 to calculate the total amount of flow removed due to the rehabilitation. Note: You must be in Edit Mode for the calculations to be performed. |
Cost Effectiveness |
This is a calculated field based on the total flow removed divided by the total cost of rehab. Press F5 to calculate the cost effectiveness. Note: You must be in Edit Mode for the calculations to be performed. |
Pipe Ranking |
This field is optional. |