The Construction tab allows agencies to document detailed information about the construction of the conduit. It also has several fields for risk analysis and replacement.
Risk Calculation
Risk |
Calculated by (Consequence of Failure x Probability of Failure). |
Construction Grid
This tab also contains a grid of all construction records that are associated to the conduit. The Sewer Structure's Present Value and Remaining Life are displayed above the grid. These are defined by the deterioration rates set up in the Construction record. These values are updated automatically by the system.
A sample of the grid appears below. Sort records in the grid by clicking on the headings. An up or down arrow (highlighted in orange below) will appear signifying ascending or descending order.
To access the Construction records go to Storm > Construction Records. For more information about Construction Records go here.