The Construction tab allows agencies to record detailed information about the construction of the pipe. It also documents location information, such as the benefit district, section, or township. Finally, the tab provides several fields for risk analysis and modeling.
Length Calculation
US Station DS Station |
If these fields are completed, then the program will automatically calculate the Length field on the Attributes tab. |
Modeling and Risk Calculation
Ignore in Model |
Check this box to prevent the Sewer Rehab model from selecting this pipe. |
Criticality |
Rates how important the pipe is. Users can sort pipe and rehab analysis records based on the importance given. |
Risk |
Calculated as: (Consequence of Failure x Probability of Failure). |
Construction Grid
The Construction tab also contains a grid that displays all construction records associated with a particular pipe. The sewer pipe's Present Value and Remaining Life are displayed above the grid. These values are defined by the deterioration rates set up in the Construction record and are updated automatically by the system.
A sample of the grid headers appears below. Sort records in the grid by clicking on the headings. An up or down arrow (highlighted in orange below) indicates whether data appear in ascending or descending order.
To access the Construction records, select Sewer > Construction Records.
More information about Construction records