The Construction tab enables agencies to document detailed information about the construction of the valve. The tab also provides several fields for risk analysis.
Value and Risk Calculations
Present Value Remaining Life |
These fields are updated automatically by the system based on deterioration rates set up up in the Construction record. |
Risk |
Calculated as: (Consequence of Failure x Probability of Failure). |
Construction Grid
This Construction tab also displays all construction records associated with the valve.
A sample of the grid appears below. Sort records in the grid by clicking on the headings. An up or down arrow (highlighted in orange below) indicates whether dat appear in ascending or descending order.
To access Construction records, go to Sewer > Construction Records.
More information about Construction records